Refine your search:     
Report No.
 - 
Search Results: Records 1-5 displayed on this page of 5
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

None

PNC TN9520 94-004, 23 Pages, 1994/07

PNC-TN9520-94-004.pdf:0.71MB

None

JAEA Reports

Mockup test apparatus for the inspection system of steam generator tubes; Design and Manufacturing

; ; ; ;

PNC TN9410 92-254, 76 Pages, 1992/07

PNC-TN9410-92-254.pdf:2.02MB

A verification test of the inspection system of Monju steam generator(SG) tubes will be performed in near future. Mockup Test Apparatus for the inspection system of SG tubes was manufactured and installed at Mechatronics Application Reserch Facility (MARF) in OEC. The test apparatus has the same specification, which is prepared for verification test, as Monju plant; for instance, which are dimension and material of tubes, and workability for the inspection equipment. About one hundred and forty SG tubes are radially arranged in tube sheets in Monju SG, however, three tubes, inner, center and outer one, are sellected in this test apparatus for testing of inspection system, It was verified that the test apparatus was manufactured with the same accuracy and dimension as Monju. System verification test is planned using this test apparatus.

JAEA Reports

None

; ; ; ; ; ; Otaka, Masahiko

PNC TN9410 92-218, 103 Pages, 1992/04

PNC-TN9410-92-218.pdf:3.49MB

None

JAEA Reports

Design study of ISI system for MONJU primary cooling piping

; ;

PNC TN9410 91-169, 87 Pages, 1991/08

PNC-TN9410-91-169.pdf:2.32MB

We have been developing a inspection tool in order to apply for ISl of 32B sized elbow piping on MONJU primary cooling circuit. Experiments and examination were carried out on design work to decide the design parameters. We obtained the results as follows, (1)The design parameters of un ultrasonic probe, such as the ultrasonic element's diameter, frequency and refraction angle, were chosen as the most suitable for fraw detection. (2)It was confirmed that the most stable scanning of the scanner was achieved by the control of 3 driving wheels. (3)The scanner could be carried by 2 persons, it's weight was 38kg. (4)The handling mechanism for thermal insulator consist's of three divided piecies and lt's driving source is pneumatic. The conclusions of this study were as follows, (1)An equipments of the volumetric examination for large scale elbow piping was designed, and it could be use at 80$$^{circ}$$C without supplying and collecting apparatus for couplant. (2)This system must be contribute the reduction of human radiation dose.

JAEA Reports

None

;

PNC TN8440 91-030, 37 Pages, 1991/07

PNC-TN8440-91-030.pdf:0.9MB

None

5 (Records 1-5 displayed on this page)
  • 1